Showing posts with label 21th-century architecture. Show all posts
Showing posts with label 21th-century architecture. Show all posts

Sunday, 5 February 2017

40. Winter in Kostino



Korolyov, Moscow Oblast. Kostino District in winter: buildings of the estate of A. Kraft and the Church of the Nativity of Theotokos.
Dmitry Ivanov. 2015. CC-BY-SA 4.0. The description of the photo →
Korolyov, Moscow Oblast. A corner of Kostino District in winter.
A view from the pond:
• The washhouse of the estate of Alexander Kraft (1874—1935) Kostino (the two-storeyed building on the left).
  Built in the beginning of the 20th century (before 1917).
• The poultry-house of the Kostino Estate (the green building on the right). Built in the beginning of the 20th century (before 1917).
• The Church of Nativity of the Most Holy Theotokos. Built in 2005.

Sunday, 15 January 2017

Moskvarium



The Centre of Oceanography and Marine Biology Moskvarium (Russian: Москвариум) is a public oceanarium in the VDNKh, Moscow, Russia. The construction of the oceanarium started in 2013, in 2015 the building was finished and opened its doors to visitors.
The total floor space of the Moskvarium is about 53,000 m2 (about 570,490 sq ft), the area of the aquarium zone is about 12,000 m2 (about 129,170 sq ft); currently (2016) it is the largest oceanarium of Europe.
Moscow. VDNKh. The main building of the Centre of Oceanography and Marine Biology Moskvarium.
Dmitry Ivanov. 2016. CC-BY-SA 4.0. The description of the photo →
Moscow. VDNKh. The main building of the Centre of Oceanography and Marine Biology Moskvarium. A general view.

The location of the Moskvarium:

Tuesday, 3 January 2017

The Small Building of the Trinity Church in Korolyov


The parish of the Orthodox Church of the Holy Trinity in Korolyov was founded in 1999 and soon the construction of the “small” church building of wood started. It was finished in 2003; on 4 July 2005 the wooden church was consecrated by Metropolitan Juvenaly.
In the same year the foundation of the new (“large”) church of bricks was laid. The works lasted about 10 years, and were completed in 2015 when the Great Consecration of the new church were carried out. The photos of the “large” building of the Trinity Church you can see here.
Korolyov, Moscow Oblast. The small wooden building of the Trinity Church.
Dmitry Ivanov. 2016. CC-BY-SA 4.0. The description of the photo →
Korolyov, Moscow Oblast. The Church of the Holy Trinity, the small wooden building of the church. A general view.

The location of the Trinity Church in Korolyov:

Address: Russia, Московская обл., г. Королёв, ул. Горького, дом 77.

Sunday, 4 December 2016

VDNKh. Pavilion No. 38 Fishing



This faced with aluminum and glass piece of the Soviet Brutalism was built in 1985.
Moscow. VDNKh. Pavilion No. 38 Fishing. A general view.
Dmitry Ivanov. 2015. CC-BY-SA 4.0. The description of the photo →
Moscow. VDNKh. Pavilion No. 38 Fishing. A view from the Fourth Kamensky Pond.
The location of the pavilion:

Monday, 17 October 2016

The Church of Saint Basil the Great in the VDNKh



Moscow. VDNKh. The Church of Saint Basil the Great.
Dmitry Ivanov. 2015. CC-BY-SA 4.0. The description of the photo →
Moscow. VDNKh. The Church of Saint Basil the Great (Russian: храм Святителя Василия Великого). Architect: Andrey Obolensky.
The building was was under consuction in 2000—2001; in 2001 it was consecrated as a chapel by Patriarch Alexy II.
In 2011 the sanctuary was attached to the chapel and Bishop Tikhon (Shevkunov) consecrated it as a church.

The location of the Saint Basil the Great Church:

Saturday, 23 April 2016

New Building of the Trinity Church in Korolyov


The Orthodox Church of the Holy Trinity in Korolyov is a relatively young church: its parish was founded in 1999 and soon the construction of the “small” church building of wood started. It was finished in 2003.

Korolyov. The Church of the Holy Trinity: the gate and the bell tower.
Dmitry Ivanov. 2016. CC-BY-SA 4.0. The description of the photo →
Korolyov, Moscow Oblast.
A fragment of the gate and the bell tower of the new building of the church.

In 2005 the foundation of the new (“large”) church of bricks was laid. The works lasted rather long, about 10 years, and were completed in 2015 when Metropolitan Juvenaly carried out the Great Consecration of the church.